Shawn Xie

Freyja Eval

Multi-Agent Evaluation

From pilot to production, with confidence

MeasurableAttributableRecoverableDual-track
Eval guiding agents from pilot to production—a lighthouse beam through fog

Value

Transferable eval design abstracted from Freyja — narrowing the trust gap

Is it performing?

Production readiness should not rest on a probabilistic “single good run”; pilot and production share one measurement scale, with aligned acceptance criteria.

What broke?

Point logs are insufficient to characterize multi-agent failures; bad cases should be classifiable with drill-down to root cause, feeding back into workflow and architecture.

How to recover?

Pre-release gates block regression; online monitoring and graded degradation provide fallback; fixes are codified as retestable samples; critical checks hold veto over release.

Architecture

Dual-trace guardrails × deterministic outcome verification × dual-track loop—the general methodology instantiated on Freyja

Outcomes

Pilot evidence: selected cases—detected, attributed, and codified

Links